2012-present
Application related 2012-present

Leningrad NPP-2

Leningrad NPP-2 is the one first Generation 3+ nuclear power plant to be built in Russia.
STS is the chief designer of the Containment Prestressing System (CPS) of reactor building.

Our company carried out the design of the CPS, manufacturing of the system and installation work.
Installation of the containment prestressing system was performed using equipment manufactured at the STS factory.

Gallery